Noise & Vibration Study:
Here is the: Noise & Vibration Comparative Analysis Report (July 2020)
Traffic Study:
Here is the Churchill, Meadow and Charleston Grade Separation Traffic Analysis Report from Hexagon Traffic Consultants, Inc., dated January 16, 2024.
Charleston Underpass Traffic Simulation AM (July 2020)
Charleston Underpass Traffic Simulation PM (July 2020)
Here is the: Churchill, Meadow and Charleston Grade Separation Traffic Analysis Report from Hexagon Traffic Consultants, Inc., dated August 13, 2020. **A minor correction/clarification was made and the resulting revision was posted on February 3, 2021**
Appendix item: Draft Traffic Impact Study Report – Churchill Ave Closure from TJKM, dated August 7, 2019. It is referenced on page 33 of the above Traffic Analysis Report from Hexagon.
Geotechnical Study:
Here is the: Preliminary Geotechnical Study (July 2023)
Sea Level Rise Study:
Here is the: Sea Level Rise Assessment (January 2024)
Heat Island Effect & Storm Water Run off Analysis:
Here is the: Heat Island Effect and Strom Water Runoff Analysis (January 2024)
Shadow Analysis:
Meadow-Charleston Viaduct – Summer (June 21 of any year)
Meadow-Charleston Viaduct – Winter (December 21 of any year)